Projects

3D architectural model of a large industrial or warehouse complex with colorful sections and parking areas.

We have been appointed as Principal Contractor for Whitworths Ltd to develop and refurbish their existing site in Irthlingborough. 


This is an exciting project that will transform Whitworths Ltd, the current production and warehouse facilities will deliver a world class environment for processing Dried Fruit Nuts and Seeds.


Note: Whitworths is the leading own label and branded supplier of dried fruit, nuts and seeds to the UK retail trade, with a turnover of c.£150m pa.  

Tall industrial silos under a blue sky.

Working with Whitworth Bros, we constructed a new flour mill and created the main mill building, flour silos, bulk flour outload and a new site traffic system. 


Project value £18m

Duration 2 years


This Project was carried out while at GKCM.

Industrial building with metallic silos and containers in a snowy setting.

Redevelopment of a flour mill in Scotland. We constructed a new state of the art flour mill alongside an existing grain silo to provide the client with a new facility.  


Project value £12m

Duration 18 months


This Project was carried out while at GKCM.

Illuminated industrial metal silos and structures at night.

2014 saw the launch of Allied Bakeries first ‘Thins’. We delivered an extensive internal refurbishment to a critical programme to achieve completion prior to the product launch date.


Project value £3m

Duration 9 months


This Project was carried out while at GKCM.

Freshly baked loaves of bread cooling on a rack in a bakery.

We worked alongside Allied Bakeries to commission its largest bread plant to date with a capacity of 10,000 loaves an hour at their Walthamstow site, East London.  






This Project was carried out while at GKCM.

 

Following a dust explosion on a maltings site in Belgium, we developed a scheme to reconstruct the site and upgrade its facilities to provide more capacity. We organised the local council’s approval for the scheme and this including obtaining the necessary permits.


This Project was carried out while at GKCM.